$+
Of Project Development
+
Years in Business

Services during the Design Development Process:
Frequently Asked Questions
Testimonials
“The design changes you suggested to the architect and subcontractors resulted in hundreds of thousands of dollars in savings, as well as a more functional building.”
“Rich’s efforts during the final stages of design saved us several hundred thousand dollars by challenging the design and construction team on several issues.”
“Although the scope of your service was limited to an analysis of the Design/Build Contractor’s scope and budget, the results proved invaluable.”
“I would have never considered adding a second level of offices until you pointed out the cost-effectiveness of doing so.”
“Your role considered the owner’s desires and addressed them in a fiscally responsible way.”
“Rich was also able to add value to the long-term performance of the facility with his suggestions.”
